HOME TO WWW.GREYWATER.COM.AU HOME TO WWW.GREYWATER.COM.AU

THE GREYWATER RECYCLING SYSTEM

The GRS is delivered with all the components required to install the greywater recycling system. These components include the following -

  1. The Installation, Operation and Maintenance Manual
  2. Distribution Pipes and Connectors
  3. Outlet Housings
  4. Aerobic Grease Filter & "H" Nozzle Components
  5. 20 year warranty

The 100mm sewer pipe and connectors, connecting your house to the GRS, are not supplied and must be installed by a qualified plumber as per the plumbing code AS 3500.

All details for installation are included in the "Greywater Recycling System Installation, Operation and Maintenance Manual."


HOME TO WWW.GREYWATER.COM.AU